Infrastructure and Construction Works at 550,000 BPD CPF and Oil Well Pads. T Wall Security Perimeters, Foundations and Construction of Substations, Utility Buildings, Underground Pipe Road Crossings, Water Piping Networks, Grouting Works, Earthworks, Access Roads, Cast in Situ Pile Foundations, Precast Production of Well Cellars, Pipe Trenches and Cable Trenches and Other Civil Works for Oil Well Pads; fast track production and installation meeting critical timetables of the oil sector; subcontractor to Samsung Engineering and LukOil Mid East Limited.