EPC CONSTRUCTION OF CLUSTER M1 WITH ACCESS ROAD AND SECURITY FACILITIES AT CLUSTER M3 AT THE WEST QURNA FIELD (PHASE 2) REPUBLIC OF

REPUBLIC OF IRAQ

SCOPE OF WORK FACILITY I:
Cluster M1
a. Oil police checkpoint;
b. 2 x Watch Towers (at least
7.0 meters height total, made of
concrete, UL 752 level 3 bulletproof
protection of walls and windows) with
AC and searchlights.
c. Well Pad / embankments;
d. Drilling rig concrete pile foundations;
e. Cellars;
f. Mud I water pits;
g. Anchored HDPE lining membrane;
h. Security protection structures
(T-Wall Fence with concertina above,
anti-ram ditch, sliding
bulletproof gates, anti-ram barriers);
SCOPE OF WORK FACILITY 2:
ACCESS ROAD
a. Access Road (including DESIGN)
to the FACILITY I (Cluster MI) with
required associated
structures such as bridges, pipe culverts,
storm drainage pipes, etc. The pro
posed access road and emergency road
to FACILITY I (Cluster MI) are ap
proximately 12,000

length. It is a dual lane, two-way road system; total
road width 7m with I.5m shoulders on both sides,
with temporary Security Checkpoint at WQ-2 security
perimeter;
b. Road signs and boards;
c. Protection of existing underground services (any pipes
and/or cables) etc.
SCOPE OF WORK FACILITY 3: SECURITY
FACILITIES FOR CLUSTER M3
a. Anti-ram arm barrier;
b. 3.6 meters height T-Wall Fence with anti-climbing
protection;
c. Sliding steel gates (at least 7.5 meters wide), UL752
level 3 bulletproof type, with motor and anti-climbing
protection;
d. Oil Police Checkpoint as described in this SECTION
III and SECTION IV;
e. 2 x Watch Towers (at least 7.0 meters height total,
made of concrete, UL 752 level 3 bulletproof
protection of walls and windows) with AC and
searchlights.
f. Restoration of the access road to CLUSTER M3
after all activities on FACILITY 3 are completed.