POWER PLANT REPLACEMENT AND UTILITY INFRASTRUCTURE UPGRADES, MASTER PLAN IMPLEMENTATION U.S. EMBASSY BAGHDAD

IRAQ

New Compound Power Plant and Main Office Telephone Exchange Building Construcion Works; Rehabilitation of existing power plant Building that will be used as a Warehouse and Central Cooling Center. SOW is including NOB, NOX1, NoX2 GCP Annex, GCP-WHA, RSO-WHA, GMP, REC, CMR, DCM, MSGQ, SDA-1 to 6, DFAC, South Gym, Water Plant / Storage Building Optional Renovation Works; New 11kV Medium Voltage Ring Line, Multi type Underground Fuel Storage Systems Installation, New Fire Extinguishing System, New Domestic Hot Water System, the New Cold Water System, New Perimeter Lighting System ,Sanitary Sewage Lines, Storm Sewage Lines, Rehabilitation of Site Telecom System, Rehabilitation of plumbing system; Landscaping and Irrigation System.

* Construction of UTL-2 (new power plant)
* Construction of UTL-3A (central office/telephone excange)
* Removal of electrical equipment in UTL-1 (existing power plant)
* New 11kV loop site electrical distribution. (at site)
* Underground fuel tank installation and connections. (at site)
* Dedicated site fire main distribution system (at site)
* Sanitary Sewer Line (at site)
* Storm sewer line (at site)
* Water System (at site)
* Waste water treatment plant effluent treatment, distribution and storage
* Telecom (at site) * Landscape, roads...
* New site domestic hot water distribution system to selected existing buildings (at site only)
* New site chilled water distribution system to selected existing buildings (at site only)
* Chiller installation to UTL-1 * 8 COGEN Heat recovery equipment installation to UTL-2
* Rehabilitation of the existing power plant (UTL-1) to warehouse and chiller plant
* New perimeter security lighting system
* Additional 2 COGEN Heat Recovery Equipments at UTL-2 together with required equipments and piping.