WATER SYSTEM REPAIR PHASE 1 PROJECT

DJIBOUTI

Scope of work covers provision of all construction and design activities for new water supply wells, performing drilling, installation, and appropriate technical testing for six (6) pilot boreholes, an existing production water supply well cleaning and rehabilitation study to assess the existing condition of current wells at Camp Lemonnier, Djibouti. Upon completion of the boreholes and water production analysis, the government will select a minimum of three (3) locations for construction of new production water supply wells. After that connection of new water wells to the raw water distribution system and updating the ROWPU Industrial Controls System (ICS) at Camp Lemonnier, Djibouti with appropriate technical testing will be executed.