Projects

ID Title Short Desc. Facts Owner Country Completion Contractor Action
12 Power Plant Replacement and Utility Infrastructure Upgrades, Master Plan Implementation, U.S. Embassy, Baghdad, Iraq Building that will be used as a Warehouse and Central Cooling Center. Construction of UTL-2 (new power plant) * Construction of UTL-3A (central office/telephone excange) * Removal of electrical equipment in UTL-1 (existing power plant) * New 11kV loop site electrical distribution. (at site) * Underground fuel tank installation and connections. (at site) * Dedicated site fire main distribution system (at site) * Sanitary Sewer Line (at site) * Storm sewer line (at site) * Water System (at site) * Waste water treatment plant effluent treatment, distribution and storage * Telecom (at site) * Landscape, roads... * New site domestic hot water distribution system to selected existing buildings (at site only) * New site chilled water distribution system to selected existing buildings (at site only) * Chiller installation to UTL-1 * 8 COGEN Heat recovery equipment installation to UTL-2 * Rehabilitation of the existing power plant (UTL-1) to warehouse and chiller plant * New perimeter security lighting system * Additional 2 COGEN Heat Recovery Equipments at UTL-2 together with required equipments and piping. Completed Project IRAQ 2015
15 Installation of Turbine Generator Unit#2 at Kajaki Dam, Afghanistan Installation of Turbine Generator Unit #2 and refurbishment of Governor, Excitation and Automation Systems The scope of Kajaki Project is Installation of Turbine Generator Unit #2 and refurbishment of Governor, Excitation and Automation Systems of Unit #1 and Unit #3 at Kajaki HPP in Helmand Province / Afghanistan. Completed Project Afghanistan 2018
17 Balad AF Runway Repair Replacement of damaged or cracked pavement, resurfacing of Runway & Taxiway Scope of work includes replacement of damaged or cracked pavement, resurfacing of Runway & Taxiway A, B, D (approximately 200.000 squaremeter of Asphalt pavement), replacement of joint sealants and repainting of entire Runway & Taxiway. Completed Project Iraq 2018
18 CAS Apron Expansion at Bagram AF, Afghanistan Apron Expansion project consists of the design and construction. <p>The Project also includes relocating existing revetments, installing new revetments, construction of HAMS pad, Trim pad, Fabric Aircraf Shelter, Armament pad, Expeditionary Fighter Shelters, AOM facility and NDI facility.</p> Completed Project Afghanistan 2015
20 Mosul Airport Reconstruction, Iraq The project covers rehabilitation of existing runway and aprons. <p>The project covers rehabilitation of existing runway and aprons, extension of runway, construction of new PCC Isolation Pad and taxiway, patrol road, service road, parking area. New construction activities include air traffic control tower, terminal building, emergency building, cargo building, reception hall, fire station building, maintenance building, medical center, airport perimeter wall with guard towers, main gate and secondary gate, MV and LV electrical distribution systems, telecommunication system and provision and installation of aviation equipment (AGL, AWOS, VSAT, DWOR, ILS, VHF/UHF D-ATIS, Air Operation Control System)</p> Ongoing Project Iraq 2015
21 Water System Repair Project Phase 2, CLDJ, Djibouti The work includes a Base Bid package which includes the installation of 0.5 MG steel elevated water storage tank. <p>The work includes a Base Bid package which includes the installation of 0.5 MG steel elevated water storage tank, booster pump system, booster pump building, site improvements, 300 mm pipe, fiber optic cable, pump control systems, and appurtenances. Bid Option 1 includes the installation of various sizes of waterline to replace existing infrastructure, while Bid Option 2 includes the installation of two fire pump systems, two fire pump buildings, site improvements at the two sites, 300 mm replacement pipe, fire communication systems, control valves with vaults, and appurtenances and incidental related work.</p> Completed Project Djibouti 2018
22 Mosul Waste Water Treatment Plant and Sewage Trunk Line Mosul, Iraq ed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium <p>ed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium doloremque laudantium, totam rem aperiam, eaque ipsa quae ab illo inventore veritatis et quasi architecto beatae vitae dicta sunt explicabo. Nemo enim ipsam voluptatem quia voluptas sit aspernatur aut odit aut fugit, sed quia consequuntur magni dolores eos qui ratione voluptatem sequi nesciunt.</p> Completed Project Iraq 2021
23 15 Megawatt Solar Power Plant, Kandahar, Afghanistan Operation of a 15.1 MW solar power plant in Kandahar. <p><strong>Project Name :</strong>&nbsp;15MW Solar Power Plant Kandahar Afghanistan<br><strong>Project Company :</strong>&nbsp;77 Construction Company<br><strong>Project Location :</strong>&nbsp;Kandahar / Afghanistan<br><strong>Project Duration :</strong>&nbsp;10 Months<br><strong>Guarantees :</strong>&nbsp;Escrow Account<br><strong>Project Cost :</strong>&nbsp;19,250,000 USD<br><strong>Project Highlights :</strong>&nbsp;It is the first BOT (Build Operate Transfer) type Investment project completed in Afghanistan. Investor will operate the plant for 20 years.<br><strong>EPC Contactor :</strong>&nbsp;77 Insaat and Taahhut A.S<br><strong>Manufacturer :</strong>&nbsp;Hanhwa Q Cells Qidong Co., Ltd. (&ldquo;Hanhwa&rdquo;), ABB, Schletter</p> Completed Project Afghanistan 2015
24 Ascension Island Auxiliary Airfield Replacement, Ascension Island Reconstructing the Ascension Island Auxiliary Airfield Runway <p>&nbsp;The airfield is to be reconstructed. After runway construction is substantially complete and the haul routes are no longer used for material transport, the primary and secondary haul routes will be restored through milling and resurfacing or reconstruction.</p> <p>&nbsp;</p> Completed Project Ascension Island 2015
25 100 Megawatt Hydro Power Plant, Kajaki, Afghanistan  Phase I (Construction of 100MW Power Plant) 2.5 years, Phase II (Construction of Spillway and Installation of Radial Gates) 1.5 years. <p><strong>EPC Contactor :</strong>&nbsp;77 Insaat and Taahhut A.S is planned to be the Engineering Procurement and Construction (EPC) Contactor for the Project Turbine<br><br><strong>Manufacturer :</strong>&nbsp;77 Insaat and Taahhut A.S has entered into a contract with Voith Hydro GmbH &amp; Co. KG for the electro-mechanical equipment procurement of the Project F<br><br><strong>Feasibility Report :</strong>&nbsp;The Feasibility Report of the Project was prepared by Hidro Dizayn Engineering and Consultancy Inc., a Group Company of LAHMEYER INTERNATIONAL</p> Completed Project Afghanistan 2018
26 Badra CPF Phase 2 - Civil Work Project includes design and construction of civil works for LPG Storage, <p>Project includes design and&nbsp;<em>construction</em>&nbsp;of&nbsp;<em>civil works</em>&nbsp;for LPG Storage,</p> Completed Project Iraq 2015
27 Surface Facility Bina Bawi, Erbil Surface Facility Bina Bawi, Erbil <p>5,000 BBL surface facility &amp; flowline civil works and electromechanical installation for OMV Company.</p> Completed Project Iraq 2015
Copyright © 77 INSAAT All Rights Reserved..
;